Supplier PortalFrom SmarteBuild

Prices from the people who set them

Suppliers keep their own products and prices up to date, answer your price requests, and return tender quotes online. You stop retyping price lists.

Supplier portal · screen recording, made-up data
Silent video A supplier's own page: products, price requests, freight, spreadsheet and team.

What it does

Their prices, kept by them

Suppliers add products, set the next price and the date it starts, or upload a whole price list as a spreadsheet. A price older than six months is marked as old for builders.

Price requests answered

Press Ask for a price on one of their products from your estimate, for the quantity you need. They answer with a price, freight to the site and how long it is good for, or say they cannot price it.

Tender quotes returned online

A trade invited to a tender package prices each item from the link in the invitation, attaches their own quote, and submits it to you. No account needed.

How it works

01

Join

A supplier asks to join or is invited. Each request is checked before an invitation is sent.

02

Sign in by email

No password: they ask for a sign-in link and stay signed in on that device.

03

Products and freight

Products, prices, delivery zones and charges, or one spreadsheet.

04

Answer requests

Price requests from builders wait on their Price requests tab.

05

Used by you

In your estimate's price lists and product picker, with freight to the site and an Ask for a price button.

On the screen

Real screenshots with made-up data, then two views drawn with sample data.

The tender quote page on a phone: the builder, package and due date, who is asking, the project, and the total with Save for later and Submit quote at the foot.
The same quote page on a trade's phone.
Price requests · answering one · sample data
Acoustic insulation batts, 75 mmWaiting for your price
Quantity: 420 m²Site: Tower A, Harbour LaneAsked by: the buyerAsked: 3 Nov 2026
Price per m² ex GST11.40
Freight to the site ex GST (optional)180.00
Price good until3 Dec 2026
Can't price thisSend my price
The tender quote page a trade opens · sample data
Your price — ex GST, per item
ItemUnitQtyPrice each (ex GST)Total
Wall liningsm²6,88058.50402,480.00
Suspended ceilingsm²4,41064.00282,240.00
Total ex GST684,720.00
Your own quote and documents: attach your quote on your letterhead
Save for laterSubmit quote

Connected to the rest of the job

Subcontractors have their own door, for claims, insurances, SWMS and letters. Subcontractor Portal →

Questions builders ask

Does a supplier pay to use it?

No. It is free for suppliers. They ask to join, and each request is checked before they are invited.

Does a supplier need a password?

No. They type their email and get a sign-in link. People in their business are added on the Team tab.

Can a supplier send a whole price list?

Yes, as a spreadsheet from the template, or as their own file. A price list is checked before builders see it.

Does a trade need an account to return a tender quote?

No. The link in the tender invitation opens the quote page. They can save it and come back, submit it, or say they are not pricing this one.

Screenshot, made-up data
A screen of supplier portal, made-up data

See it on a project like yours

An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.