Draft for review. Not published.
SafetyAvailable

An incident is not finished until the fix is done

Record what happened on the day, give each corrective action to a person with a date, and close the incident only when every action is done. Hazards seen on site are given out and closed out the same way.

Safety · sample data
Harbour Lane Apartments
Open incidents3
Open actions, 1 overdue2
Open hazards, 1 overdue4
Days since the last lost-time injury5
Incidents Observations
No.WhenKindWhat happenedActionsStatus
INC-004 12 Nov 2026 Injury
HighLost time
Scaffold plank slipped and struck a worker on the shoulder
Tower A, Level 3
2 open 1 overdue Under investigation
INC-003 6 Nov 2026 Near miss
Medium
Load swung close to the hoist landing
Tower A, Level 5
None open Reported
INC-002 28 Oct 2026 Property damage
Low
Delivery truck clipped the site fence
Main gate
None open Reported

What it does

Corrective actions that get done

Each action has a person and a due date, and shows Overdue when it slips. The incident will not close while one is still open.

Notifiable incidents, step by step

The regulator's number for the job's state, the incident details ready to read out, and a record of who rang, when and the reference.

Hazards closed out

A hazard seen on site is recorded with a photo, given to someone with a date, and stays open until they say what was done.

How it works

01

Record it

When, what kind, how serious, where, what happened and who was involved.

02

Tell who must know

The job's sign-off people get a notice; a notifiable incident opens the regulator steps.

03

Investigate

Notes on the cause, photos and files, all on the incident.

04

Fix it

Corrective actions, each with a person and a due date, marked done.

05

Close

Only when every action is done. It can be reopened if needed.

On the screen

INC-004 Injury · corrective actions · sample data
Corrective actions
+ Add an action
What is to be doneWhoDue
Fit toe boards to the Level 3 scaffoldThe site manager14 Nov 2026 Overdue
Toolbox talk on passing materials up scaffoldsThe foreman19 Nov 2026
Check every lift for loose planks
All levels checked, two planks replaced
Dryline InteriorsDone
13 Nov 2026
INC-004 cannot be closed yet

2 corrective actions are still open. Mark them done, or delete them, and then close the incident.

Notifiable incident: what to do now
The regulator must be told straight away. The job's sign-off people and administrators have been alerted.
1. Tell the regulatorNot recorded
Anyone needing urgent help: call 000 first. Then ring the regulator now.
State the job is in
The state's safety regulator
Their phone number, tap to call
Their online form · Copy the incident details
2. Leave the area as it isArea held
3. Report it to the workers' comp insurerdue Thu 19 Nov, 2 days left
Record that the regulator was told
Observations · sample data
No.SeenKindWhat was seenAssigned toDueStatus
OBS-00915 Nov 2026HazardOpen penetration in the slab with no cover
Tower A, Level 5
The foreman16 Nov 2026 OverdueOpen
OBS-00813 Nov 2026HazardExtension lead run through standing water
Basement
Dryline Interiors20 Nov 2026Open
OBS-00712 Nov 2026Good practiceFormwork crew tagged out the hoist before working under itNoted
OBS-00610 Nov 2026HazardMissing edge protection at the stair void
Tower A, Level 4
The site manager11 Nov 2026Closed out

Connected to the rest of the job

The safety record sits on the project, beside everything else that happens on site.

Questions builders ask

Who can read an injured worker's details?

Only people given "See incident details", and the person who reported the incident. Everyone else with the module sees just the number, the date, how serious it was and whether it is open.

Does it report a notifiable incident to the regulator for me?

No. The law asks for the fastest means, which is a phone call. Safety shows the regulator's number for the job's state, has the details ready to read out, alerts the job's sign-off people, and keeps the record of who rang, when and the reference. The incident cannot be closed or deleted until that call is recorded.

Can an incident be closed with actions still open?

No. Closing says how many corrective actions are still open and offers no button until each is marked done or deleted.

Can I print the incident register?

Yes. Each incident has its own PDF, and the incident register lists every incident as a PDF. Both can be saved to the job's Documents.

Do subcontractors' workers need a log-in to be named?

No. People involved are typed by name, with their part in it and who they work for.

Read the help guide →

See it on a project like yours

An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.