Hand over every unit with its defects closed and the keys signed for
Book the inspection, clear the unit's defects, go through the checklist with the buyer and have them sign on your phone. The certificate is ready the moment they do.
| Unit | Client | Status | Open defects |
|---|---|---|---|
| Tower A, Level 5 · 4 units, 1 handed over | |||
| 501 | A. Lawson | Handed over 3 Oct 2026 | None (2 fixed) |
| 502 | K. Shah | Ready to hand over 6 Oct 2026 | None |
| 503 | None | Inspected 2 Oct 2026 | 2 open |
| 504 | M. Ortiz | Inspection booked 9 Oct 2026 | None |
What it does
Every unit, where it stands
A board of every unit by building and level: not ready, inspection booked, inspected, ready to hand over or handed over, with its open defects.
Defects from one list
The unit's defects are read from the Defects list, not kept twice. A unit with an open defect cannot be marked ready, and Mark fixed works from the unit.
Signed on the spot
The person taking the keys signs on the phone or tablet, or on a printed form you add back to the unit. The certificate follows straight away.
How it works
Book the inspection
Pick the day. Record it afterwards with a note of who was there.
Close the defects
Defects found go on the Defects list. Mark each fixed as the trades finish.
Mark it ready
Only once no defect on the unit is open.
Walk the checklist
Keys, remotes, meter readings, manuals, appliances: Done or Not applicable.
Sign and hand over
The buyer signs, the unit is handed over, and the certificate is ready.
On the screen
Made to be used standing in the unit, phone in hand: each unit is one row, the step buttons are thumb-sized, and the signature box takes the width of the screen.
A unit with an open defect cannot be handed over. Someone allowed to hand over with open defects is asked why instead:
To finish after handoverOpen
The defect stays open in Defects, shows on the board and prints on the certificate as to be finished after handover.
The steps a unit goes through
Connected to the rest of the job
The units, the defects and the buyer come from the modules that already hold them. Handover adds the steps, the checklist and the signature.
Questions builders ask
Do we keep defects in two places?
No. The unit lists the defects on the Defects list that are on it, by its building or unit or by a location that starts with its code. Defects are added and changed in Defects; Mark fixed on the unit marks the same defect fixed there.
Can a unit be handed over with a defect still open?
Only by someone given that permission, and only with a reason. The open defects are recorded as to be finished after handover, stay open in Defects, and print on the certificate.
What if the buyer will not sign on a screen?
Print the handover form for the unit, have it signed by hand, and add a photo or scan of it to the unit. It then stands for the signature, and the certificate says it was signed by hand.
Does the buyer get a copy?
A buyer set up as the unit's client in Finishes Schedule sees a Handover tab in their client portal: where their unit stands, and the certificate to download once it is handed over. Nothing is emailed.
Can we change the checklist?
Yes. Each project has its own list: add, rename, reorder or remove items, make an item a meter reading, or copy the items of another project.
See it on a project like yours
An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.
