RFIsFrom SmarteBuild

Questions answered, with the drawing beside them

Raise an RFI with the drawings attached and an answer-by date. The consultant answers through a link, and you close it with whether it changes the cost or the time.

Documents · RFIs · screen recording, made-up data
Silent video The RFI list, an answered RFI with the engineer's reply, and a closed one with its outcome.

What it does

Asked with the drawings

Attach the drawings from Documents, say where on site, and pick the building or unit. A superseded drawing is caught, with the current revision offered instead.

Answered through a link

The consultant opens the question and the drawings, types the answer and attaches files. No account. You are emailed when it is answered.

Closed with the outcome

Does it change the cost? The time? If yes, you are reminded to raise a variation, and an extension of time if the programme moves.

How it works

01

Raise

Subject, where, the question, the answer-by date and who to ask.

02

Emailed a link

Each consultant asked gets their own link to the question and drawings.

03

Answered

Their answer turns the RFI to Answered and tells you.

04

Follow up

Reply or ask a follow-up question on the same RFI.

05

Close

Record whether it changes the cost or the time, with a note.

On the screen

Documents · RFIs · screenshot, made-up data
RFI-002 Pier depth at gridline C open beside the list: the question, where and which building, the drawing it is about at its revision, the engineer's answer with a file, a reply box, and the outcome: changes the cost, changes the time, a note, Close RFI or Withdraw.
The answer comes back on the RFI. Close it with whether it changes the cost or the time.
Raise an RFI · sample data
SubjectWindow W4 head height
Where (optional)Gridline C/4, level 3
Building or unitTower A · Level 3
The questionA-301 shows the W4 head at 2400, the window schedule says 2700. Which is right?
Answer by12 Nov 2026
AskProject architect
CancelRaise and email
RFI-012 · Outcome · sample data
Balustrade fixing to slab edge
ANSWERS AND REPLIES · Architect
Use the side-fixed bracket in detail 7 on A-520. Revised detail attached.
Outcome
Changes the cost?Not knownNoYes
Changes the time?Not knownNoYes
If this is the client's change, raise a variation, and an extension of time if the programme moves.
WithdrawClose RFI
My RFIs: questions inside the team · sample data

An estimator, buyer or site manager can also ask a colleague, from a BOQ item, an order, a variation, a tender, a schedule task, a defect or a colour selection. My RFIs lists them across every project, with a bell when one is waiting for you and when yours is answered.

Waiting for youYou askedEverything
Which board on the lift lobby ceiling?
Harbour Lane Apartments · About Order · Asked by the buyer
Open
Rate for core-filling blockwork?
Northgate Medical Centre · About BOQ item · Asked by the estimator
Late

Connected to the rest of the job

RFIs sit in the project's Documents, next to the drawings they ask about.

Questions builders ask

Does the consultant need an account?

No. They get a link by email that shows the question and the drawings, with a box for their answer and files.

Can we ask more than one consultant?

Yes. Each person asked gets their own link, and you can copy it or send it again from the RFI.

Does an RFI raise a variation?

No. You record whether it changes the cost or the time. When it does, the RFI reminds you to raise a variation, and you note its number on the RFI.

What if the drawing attached has been superseded?

You are warned that the drawing is superseded and offered the current revision instead.

A closed RFI · screenshot
RFI-001 Window W4 head height, closed: the question, the two drawings it was about, the architect's answer, and the outcome recorded with a note.
The outcome stays on the record with the answer.