Everyone builds off the current revision
Upload Rev D and it replaces Rev C. The old sheet is kept and marked superseded, anyone about to issue it is warned, and the current set downloads as one zip.
What it does
A new revision replaces the old
The number and revision are read from the file name. Upload A-101 Rev D and you are told, before anything is stored, that it supersedes Rev C.
Warned before it is used
A superseded sheet opens under a warning. Put one on a transmittal or an RFI and you are offered the current revision instead.
The current set in one go
Narrow it by discipline, status, building or level. Download it as one zip, or print the drawing register for the certifier.
How it works
Upload
Drop the files in. Number and revision come from the file name.
Check the plan
A window says which drawings are new revisions, before anything is stored.
Old one superseded
Rev C is kept, marked superseded, in the same folder as Rev D.
Re-issue
Everyone who holds Rev C is listed, with one button to send them Rev D.
Current set
The register lists Rev D. Download it or print it.
On the screen
From Northline Architects · 6 Nov 2026 · Accepting makes Rev E current and marks Rev D superseded. Decline Accept
Until someone accepts it, the current revision stays current: in the register, in the downloaded set, and on new orders and tenders.
Connected to the rest of the job
Drawings sit in Documents, with the transmittals and RFIs that point at them.
Questions builders ask
How does it know which drawing a file is?
From the file name. "A-101 Rev D Floor Plan.pdf" gives drawing A-101, Rev D. You can change the number and revision on the file afterwards, or in place on the register.
What if a late Rev B turns up after Rev C?
It does not replace Rev C. It is kept as history, marked superseded straight away, and shows in the drawing's list of revisions.
Can we still issue an old revision on purpose?
Yes. You are warned and offered the current one; if you go ahead, it is issued and the record shows the warning was seen.
Can a consultant upload straight in?
Yes, through an upload link for a folder, with no account. A drawing whose number is already current waits for someone on your side to accept or decline it.
Do we need to set anything up?
No. Name files with their number and revision and the rules apply. Files without a number stay ordinary documents.
See it on a project like yours
An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.