See which levels each trade has passed
Say once which checklist each trade is inspected with, and how often. Every unit and level that needs an inspection follows from the building, and the grid fills in as the checklists are completed.
| Trade | Ground | Level 1 | Level 2 | Level 3 | Level 4 |
|---|---|---|---|---|---|
| Waterproofing Each unit · 10 of 16 passed | – | 4/4 | 4/4 | 2/4 | 0/4 |
| Fire stopping Each level · 3 of 5 passed | Passed | Passed | Passed | Failed | Not started |
| Plasterboard Each unit · 5 of 16 passed | – | 4/4 | 1/4 | 0/4 | 0/4 |
What it does
A plan, not a pile of forms
Each trade gets its checklist and how often it is inspected: each unit, each level, each building or once. Add a level in Buildings and Units and its inspections appear.
Hold points that hold
A checklist cannot be completed until each passed hold point is released by a named person and their company. Witness points record who saw it.
A register you can hand over
For any trade, every place it was inspected: the result, who started and completed it, who signed, and who released each hold point. Ready to print.
How it works
Mark the template
Under Templates, set the items that are hold or witness points.
Add the trades
In the plan: trade, checklist and how often. It says how many inspections that needs.
Start from the grid
Click the level, press Start on the unit. The checklist opens with the unit filled in.
Release and complete
Pass, Fail or N/A on each item, release the hold points, sign if needed, Complete.
The level is passed
When every unit has passed, the cell turns green. Failed items go to Defects.
On the screen
Where an inspection can go
| Place | State | Started | Completed | Signed | Hold points |
|---|---|---|---|---|---|
| Tower A, Level 1, Unit 101 | Passed | the site manager 2 Sep 2026 | the site manager 2 Sep 2026 | Sam Rossi (Coastline Certifiers), 2 Sep 2026 | Membrane cured before tiling: released by Sam Rossi (Coastline Certifiers), 2 Sep 2026 |
| Tower A, Level 1, Unit 102 | Passed Inspection 2 | the site manager 5 Sep 2026 | the site manager 5 Sep 2026 | Sam Rossi (Coastline Certifiers), 5 Sep 2026 | Membrane cured before tiling: released by Sam Rossi (Coastline Certifiers), 5 Sep 2026 |
| Tower A, Level 3, Unit 303 | In progress | the site manager 14 Oct 2026 | Membrane cured before tiling: not released | ||
| Tower A, Level 4, Unit 401 | Not started |
Connected to the rest of the job
The inspections come from the building's own levels and units, and what fails goes straight to the defect list.
Questions builders ask
Do we have to set up each unit's inspection by hand?
No. You add the trade once, with its checklist and how often. The inspections it needs are worked out from the buildings, levels and units, and a level added later brings its inspections with it.
What stops someone completing a checklist past a hold point?
The checklist cannot be completed while a hold point answered Pass has not been released. The release records who released it, their company, and the time with the login of the person entering it.
What happens when an inspection fails?
Each failed item can raise a defect, which goes on the Defects list at the same building, level or unit. The grid then offers Inspect again for that place, and the latest inspection decides the cell. A failed checklist can also be closed out once its items are dealt with.
Can we use our own checklists?
Yes. Make your own under Templates, or copy a SmarteBuild starter and change it. A change to a template never rewrites a checklist already started from it.
Can the certifier get a copy?
Choose the trade in the Register and print it from the browser: every place, its result, who signed and who released each hold point.