Quality: ITPs and checklistsAvailable

See which levels each trade has passed

Say once which checklist each trade is inspected with, and how often. Every unit and level that needs an inspection follows from the building, and the grid fills in as the checklists are completed.

Quality · Harbour Lane Apartments (sample data)
ITPs Checklists 3 Templates
17Not started 2In progress 18Passed 1Failed
ProgressPlanRegister
Hold points waiting on the programme
Waterproofing · Tower A, Level 3, Unit 303 · Hold point waiting, Tiling Level 3 starts in 3 days
TradeGroundLevel 1Level 2Level 3Level 4
Waterproofing
Each unit · 10 of 16 passed
–4/44/42/40/4
Fire stopping
Each level · 3 of 5 passed
PassedPassedPassedFailedNot started
Plasterboard
Each unit · 5 of 16 passed
–4/41/40/40/4
Not startedIn progressPassedFailed

What it does

A plan, not a pile of forms

Each trade gets its checklist and how often it is inspected: each unit, each level, each building or once. Add a level in Buildings and Units and its inspections appear.

Hold points that hold

A checklist cannot be completed until each passed hold point is released by a named person and their company. Witness points record who saw it.

A register you can hand over

For any trade, every place it was inspected: the result, who started and completed it, who signed, and who released each hold point. Ready to print.

How it works

01

Mark the template

Under Templates, set the items that are hold or witness points.

02

Add the trades

In the plan: trade, checklist and how often. It says how many inspections that needs.

03

Start from the grid

Click the level, press Start on the unit. The checklist opens with the unit filled in.

04

Release and complete

Pass, Fail or N/A on each item, release the hold points, sign if needed, Complete.

05

The level is passed

When every unit has passed, the cell turns green. Failed items go to Defects.

On the screen

A checklist started from the ITPs · sample data
← All checklists Complete
The checklist is not finished yet.
Hold point not released: Membrane cured before tiling
Waterproofing In progress
Building or unit: Tower A, Level 3, Unit 303
Substrate clean and dryPass
Membrane cured before tiling hold pointPass
Release hold point
Flood test witness pointPass
Witnessed by Sam Rossi (Coastline Certifiers) · 14 Oct 2026, 10:20
Upturns at walls and hobFail
Raise defect
Plan · Add a trade to the plan · sample data
Trade
Waterproofing
Checklist
Wet area waterproofing
1 hold point must be released before an inspection can be completed.
How often
Each unitEach levelEach buildingOnce
16 inspections: one for each unit.
Holds up (optional)
Tiling Level 3
Done by (optional)
SC-007 Wet areas · Seal Tight Waterproofing
CancelAdd to plan

Where an inspection can go

Inspection and test plan register: WaterproofingSample data · 10 of 16 passed
PlaceStateStartedCompletedSignedHold points
Tower A, Level 1, Unit 101Passedthe site manager
2 Sep 2026
the site manager
2 Sep 2026
Sam Rossi (Coastline Certifiers), 2 Sep 2026Membrane cured before tiling: released by Sam Rossi (Coastline Certifiers), 2 Sep 2026
Tower A, Level 1, Unit 102Passed
Inspection 2
the site manager
5 Sep 2026
the site manager
5 Sep 2026
Sam Rossi (Coastline Certifiers), 5 Sep 2026Membrane cured before tiling: released by Sam Rossi (Coastline Certifiers), 5 Sep 2026
Tower A, Level 3, Unit 303In progressthe site manager
14 Oct 2026
Membrane cured before tiling: not released
Tower A, Level 4, Unit 401Not started

Connected to the rest of the job

The inspections come from the building's own levels and units, and what fails goes straight to the defect list.

Questions builders ask

Do we have to set up each unit's inspection by hand?

No. You add the trade once, with its checklist and how often. The inspections it needs are worked out from the buildings, levels and units, and a level added later brings its inspections with it.

What stops someone completing a checklist past a hold point?

The checklist cannot be completed while a hold point answered Pass has not been released. The release records who released it, their company, and the time with the login of the person entering it.

What happens when an inspection fails?

Each failed item can raise a defect, which goes on the Defects list at the same building, level or unit. The grid then offers Inspect again for that place, and the latest inspection decides the cell. A failed checklist can also be closed out once its items are dealt with.

Can we use our own checklists?

Yes. Make your own under Templates, or copy a SmarteBuild starter and change it. A change to a template never rewrites a checklist already started from it.

Can the certifier get a copy?

Choose the trade in the Register and print it from the browser: every place, its result, who signed and who released each hold point.

Read the help guide →