Know who has every shop drawing, and when the answer is due
Send each submittal to its reviewers in turn, record what comes back, and start the next revision when it has to change. The register shows what is with whom, and what is late.
| No. | Submittal | Responsible | With | Required by | Status |
|---|---|---|---|---|---|
| S-014 | Balustrade glass Shop drawing · Tower A, Level 5 | Clearview Glazing | Smith Architects | 2 Dec 2026 | Out for review |
| S-012 rev 1 | Plasterboard wall systems Product data · 09 21 16 | Dryline Interiors | Dryline Interiors | 25 Nov 2026 | Revise and resubmit |
| S-011 | Structural steel connections Shop drawing · Tower A | Ridgeline Steel | Coastal Engineers | 18 Nov 2026 Overdue | Out for review Reply overdue |
| S-009 | Bathroom floor tile Sample · Unit 501 | Stoneworks Tiling | Approved as noted |
What it does
Reviewers in turn
Up to six reviewers, in order: the architect, then the engineer, or someone in your own team. Each gets it once the one before has approved it.
Reply-due dates that fill themselves in
Your company sets the number of days. Each send fills in the date, and the register marks a late reply and a late required-by date.
Every revision kept
What went, to whom and when, each reviewer's answer and comments, and the marked-up files that came back. Earlier revisions never change.
How it works
Add it
Title, type, who prepares it, the location and when it is needed on site. It gets the next S number.
Send for review
Name the reviewers in turn and attach the files. The reply-due date fills in.
Record each answer
Approved, Approved as noted, Revise and resubmit, or Rejected, with the reviewer's comments.
Revise if needed
Start the next revision. It goes back to the same reviewers, and the earlier one is kept.
Approved
When every reviewer has approved it, it is finished and leaves the open list.
On the screen
- Sent on 4 Nov 2026 by the project manager.
- Coastal Engineers (reviewer 1): Approved as noted on 10 Nov 2026.Fixing centres to suit slab edge at grid C.
- Smith Architects (reviewer 2): waiting for the answer since 10 Nov 2026. Reply due 24 Nov 2026.
Connected to the rest of the job
The submittal knows who prepares it, where it goes on the building, and where its files are kept.
Questions builders ask
Does it email the architect?
No. Send the drawings the way you do now. The register records when they went, who has them, and the answer that came back.
What happens when one reviewer asks for changes?
The revision stops there and the reviewers after are not asked. It goes back to the subcontractor or supplier, and you start the next revision when it is ready. It goes to the same reviewers again.
Can someone in our team be a reviewer?
Yes. A reviewer can be an outside party typed by name, or a person in your company. A person in your company gets a notice on the bell when it reaches them, and can record their own answer.
When is a reply due?
Your company sets the number of days after sending, 14 until changed. The date fills in when a submittal is sent and can be changed on each one.
Can I print the register?
Yes. Print gives the register as filtered, with every column, and can be saved as a PDF from the browser's print window.
See it on a project like yours
An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.