On site · the phone pageAvailable

Approve, log defects and inspect from your phone

On site is a page of SmarteBuild made for a phone. Open it in the phone's browser, signed in as usual, and put it on the home screen. What is waiting for your approval, the project's defects and its inspections are a thumb away, with the same rules as the office.

Nothing to download from an app store. It needs signal: it does not work offline.

Silent video Approvals, Defects and Inspections on the phone. Screen recording, made-up data.

What it does

Approvals

Everything waiting on you, oldest first. Approve, send back or reject, through the same approval workflow as the office.

Defects

The project's defects by building, level or unit. Log one with photos from the camera, add photos, mark it fixed.

Inspections

What the inspection plan requires at each place. Answer item by item, release hold points, raise a defect from a failed item, complete.

SWMS

Which companies are cleared to start on the project, and each accepted SWMS to open, for the site manager at the gate.

How it works

01

Open it on the phone

In the phone's browser, signed in with your usual SmarteBuild login.

02

Keep it on the home screen

Add it from the browser's menu. It then opens full screen, named On site.

03

See only what you hold

One tab for each of Approvals, Defects, Inspections and SWMS that your permissions give you.

04

Same project, same rules

The project chosen on the phone is the one on your desktop, and every change goes through the office's own rules.

On the screen

Real screenshots of the phone page with made-up data. Big buttons, one column, nothing that scrolls sideways, and the same night mode as the desktop.

The Approvals tab: Waiting for me, with a purchase order and a subcontractor claim, each with its amount, the project, who sent it and how long it has waited.
Waiting for me, oldest first.
The Log a defect form: where, what is wrong, a button to take or choose photos, and Save defect.
Log a defect, with photos from the camera.
The Inspections tab: the project, a location filter, To do and Done, and five required inspections with their trade, place and whether they are in progress or not started.
What the plan requires, place by place.
A wet area waterproofing inspection in progress, in the dark skin: Pass, Fail and N/A on each item, a hold point, a measurement box, notes, photos and Complete inspection.
Doing an inspection, in night mode.
The Defects tab: the project, a location filter, Open and Fixed, Log a defect, and two open defects with where they are and who is to fix them.
The project's defects, open first.
A purchase order waiting for approval on a phone: the amount ex GST, the supplier, project and sender, the first lines of the order, who decides at each step, a comment box, and the Reject, Send back and Approve buttons.
One request, and the decision.
What it is, plainly
  • A page of your SmarteBuild Commercial site, made for a phone, called On site.
  • Opened in the phone's own browser, with the same login. Add it to the home screen and it opens full screen like an app.
  • Not in the App Store or Google Play, and nothing to install.
  • It needs signal. A save made without signal says so and keeps what you typed.
  • It sends nothing new: no push notifications, no text messages. Approvers are told the way the approval workflow already tells them.
What stays on the desktop
  • Deciding an approval on someone else's behalf, and taking a request back.
  • Setting up approval workflows, inspection plans and checklists.
  • Reviewing and uploading SWMS: on the phone the register is read only.
  • Every other module. The menu's Open the full site goes to the desktop pages.

Connected to the rest of the job

The phone page keeps nothing of its own. It reads and writes the same records as the desktop screens, through the same rules and permissions.

Questions builders ask

Is it an app from the app store?

No. It is a page of SmarteBuild made for a phone. You open it in the phone's browser and can add it to the home screen, where it opens full screen as On site. There is nothing to install and no separate login.

Does it work without signal?

No. It needs signal to load and to save. If a save fails for lack of signal, it says so and keeps what you typed, so you can try again.

Is approving on the phone the same as in the office?

Yes. The decision goes through the same approval workflow: the same steps, the same people told, the same history. Send back and reject need a comment, and each decision is said back to you before it is made.

Who sees what?

Each person sees a tab only for what they already hold: My Approvals, Defects, Quality, and the SWMS register. Buttons follow the same permissions as the desktop, and the server checks again on every save. Projects are the ones that person can open.

Can a hold point be released on the phone?

Yes, once its item has passed, with the name and company of the person releasing it. An inspection cannot be completed while a hold point is waiting.

Read the help guide →

Screenshot, made-up data
A screen of phone app, made-up data

See it on a project like yours

An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.