Describe the building once. Find everything by level and unit.
Add a tower, all its levels and every unit in a few steps. Then a defect, a checklist, a site photo, an RFI or a drawing can sit on Unit 501, and any list can be narrowed to one level.
What it does
A tower in a few steps
Add every level of a building at once, then every unit on those levels, numbered for you: 501, 502 on Level 5, or straight through.
Unit types described once
A two-bedroom of 85 m² is set up once with its bedrooms, bathrooms and car spaces. Every unit of that type points at it.
The same places everywhere
Defects, checklists, site diary photos, RFIs and documents all choose from this one list, so a level means the same thing on every screen.
How it works
Add the unit types
Name, code, use, bedrooms, bathrooms, car spaces and area.
Add a building and its levels
Type how many above ground and how many basements. Ground is always there.
Add the units
Tick the levels, say how many on each and their type. Change the few that differ.
Use them on the job
Put records on a unit, level, building or area, and narrow lists to one place.
On the screen
A record can sit on any of these. Filter by Level 5 and you also get everything on its units.
Pick the place, or filter the list by it
- Buildings open, levels fold, and the search finds a unit by its number.
- A record can sit on a unit, a level, a building or an area.
- Filter by a level and the list keeps what is on its units too.
- A project with no buildings set up shows no location field at all.
- A deleted unit keeps its name on old records, marked “(removed)”.
Connected to the rest of the job
The project's shape is entered once, and every module that works by place reads it from here.
Questions builders ask
Do I have to set up buildings on every project?
No. Locations are optional everywhere. A project with no buildings set up shows no location field and no location filter, and a record without a location is for the whole project.
How are the units numbered?
By level (501, 502 on Level 5; G01 on Ground; B101 in Basement 1) or straight through (1, 2, 3). You can set the first number and a prefix such as "A". A unit number is used only once on a project; a number already taken is skipped, and you are told how many were.
Can a defect be on a level rather than a unit?
Yes. A record can sit on a unit, a level, a building or an area such as the roof. Filtering by a level finds the records on the level itself and on every unit and area inside it.
What happens to records if a unit is deleted?
They keep the unit's name, marked "(removed)", and it can no longer be chosen for new records. Deleting a building or a level removes everything inside it; the screen asks first and says so.
Who can change the buildings and units?
Anyone who can open the project sees the locations. Changing them needs the "Set up buildings, levels and units" permission, deleting needs "Delete buildings, levels and units", and unit types need "Manage unit types".
See it on a project like yours
An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.