Documents and transmittalsFrom SmarteBuild

Know who has which revision

Every file on the project in one place, opened in the browser, PDF or CAD. Issue documents on a numbered transmittal and see who opened it and who acknowledged it.

Documents · screen recording, made-up data
Silent video A file and its revisions, the register, then a transmittal: who opened it and who acknowledged it.

What it does

Every file, opened in the browser

Folders for the project, a search across all of them, and old versions kept. PDFs and photos open straight away, Word and Excel are shown as PDF, and DWG and DXF drawings open in a CAD viewer.

Transmittals with a receipt

Issue one document or a set, for construction, tender, review or approval. Each person gets a link with no login, and you see when they opened it and when they acknowledged it.

Consultants upload straight in

Send the architect or engineer an upload link for a folder. They drop their files in without an account, and the link stops working on the date you set.

How it works

01

Tick the documents

In Files or the drawing register, then Issue.

02

Say what for

Subject, issued for, a message and a respond-by date if you want one.

03

Issue

It gets the next TR number. Email each person their link, or copy the links and send them yourself.

04

They open it

The documents show in the browser, ready to download. No account needed.

05

Acknowledged

They type their name and confirm receipt. You see who has and who has not.

On the screen

Issue 2 documents · sample data
SubjectLevel 5 and 6 slabs, current revisions
Issued forFor Construction
Respond by (optional)11 Nov 2026
Issue toFormwork foremanConcrete supplierSite engineer
Email each person their link now (from your company's email, you copied in)
CancelIssue and email 3
What the person receiving it sees · sample data
Transmittal TR-014
For ConstructionRespond by 11 Nov 2026
S-101 Level 5 slab plan · Rev DDownload
S-102 Level 6 slab plan · Rev CDownload
Please confirm you have received these documents.
Your nameSam Rivera
I have received these

Connected to the rest of the job

The drawing register lives here. Switch it on and the Register tab lists every drawing at its current revision. How drawings work →

Questions builders ask

Does the person receiving a transmittal need an account?

No. Each person gets their own link. It opens the documents in the browser and asks them to confirm they received them.

Is the transmittal emailed?

Only if you tick it. The email goes from your company's address with you copied in. Otherwise copy each person's link and send it yourself.

What if a drawing on a transmittal is superseded later?

The transmittal keeps the revision it issued, and the document is marked "Superseded since". On the drawing, the Issued tab lists everyone holding an older revision, with one button to send them the current one.

Can we open CAD files?

Yes, DWG and DXF open in a viewer in the browser. It is for looking, not for editing.

Can we keep some folders private?

Yes. Each folder can be open to everyone on the project or only to the people you choose.

The Documents register on a phone: the views across the top, the filters stacked, a consultant's drawing waiting with Decline and Accept, and the drawings below.

See it on a project like yours

An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.