AI assistanceFrom SmarteBuild

It reads the paperwork. You decide what counts.

AI reads drawings, quotes, bills and price lists, and drafts a take-off or a schedule. You see what it found before anything is added, and nothing counts until you accept it.

Defects · Describe from photo (AI) · screen recording, made-up data
Silent video The AI looks at the defect's photo and suggests the words; nothing changes until Use this.

What it does

Reads what arrives

A trade's quote into a tender, a supplier's bill into Expenses, a supplier's new prices into your price list. Each shows what was read, for you to check.

Drafts the first pass

A whole take-off from the drawings, every item of a kind found on a page, the drawing's scale, or a project schedule. You see the plan before anything is added.

Paid as you use it

Prepaid AI credit, bought in packs by an administrator. Each job takes what it actually cost, and the AI credits page lists every one.

How it works

01

Ask

Press the AI button where the work is: Read quote, Read with AI, Draft this take-off.

02

It reads

The document or drawing is read, and the result is shown, not saved.

03

You check

Change, untick or throw away anything it got wrong.

04

You accept

Only what you accept is added. The job's cost comes off your AI credit.

On the screen

Real screenshots of Describe from photo (AI) in Defects, with made-up data, and Read quote in Tenders drawn with sample data.

Defects · screenshot, made-up data
A defect open beside the defects list, with the AI's suggestion from the photo: Check this, the suggested words, the place and supplier, and Use this or Dismiss above the observation as typed.
The suggestion sits above the form, marked Looks right or Check this. The form is untouched.
Defects · after Use this · screenshot, made-up data
The same defect after Use this: the observation now holds the AI's fuller wording, with Unsaved changes and Save at the foot.
After Use this: the words are in the form, and still not saved until you press Save.
Where the AI is · each one shows its result for you to check
WhereThe buttonWhat you do with the result
Take-OffDraft this take-off · Measure with AI · Read the scale with AIAdded items show for review; nothing counts until you accept it on the drawing
EstimateAsk AI · Final check: Read with AISuggestions; you decide. Final check findings are marked to check against the estimate
TendersRead quote (AI) · Check quotes with AICreate quote when it is right; checks are advice only
ExpensesNew expense from a document: Read with AICheck the fields, then save the expense
Price listsUpdate from supplier file (AI)Tick the changes, then apply them
ScheduleDraft with AI…Put the draft in the schedule, or replace it; nothing changes until you do
Site Diary · DefectsWrite it up (AI) · Describe from photo (AI)Use each piece of the write-up, or not
Project pageAsk the projectAn answer only; nothing is changed or saved
Suppliers · TendersFind local businessesCheck each business before it is added
AI credits · sample data
AI credits
AI credit left, until 4 Nov 2027A$ ···
used this monthA$ ···
free whole-job take-off drafts left2 of 3
What your credit went on
DateWhatWho
5 NovTender: reading a quote
Used
the estimator
4 NovTake-Off: whole job draft
Free
the estimator
4 NovCredit pack
Bought
the administrator
Amounts are in Australian dollars, before GST. Amounts left out of this sample.
How the credit works
  • An administrator buys a pack of AI credit by card. It is paid once and nothing renews by itself.
  • A new company starts with welcome credit and three free whole-job take-off drafts.
  • Each AI job takes what it actually cost to run, not a set fee per click.
  • A job does not start unless the credit left covers a large job of its kind.
  • You are emailed when the credit runs low. Credit lasts 12 months from the last pack.
  • When it runs out, only the AI buttons stop. Everything else in SmarteBuild keeps working.

Connected to the rest of the job

The AI works inside the screens you already use. There is nothing separate to open.

Questions builders ask

Does the AI change anything by itself?

No. Every result is shown for you to check first. A take-off, a quote, an expense or a price change is added only when you accept it.

How is it paid for?

From prepaid AI credit that an administrator buys in packs. Each job takes what it cost to run, and the AI credits page lists every job with who ran it.

What happens when the credit runs out?

The AI buttons say there is not enough credit and an administrator can buy more. Everything else keeps working.

Can it be wrong?

Yes. That is why you check it. Quote checks say so plainly: check the quote itself before you rely on it.

Screenshot, made-up data
A screen of ai assistance, made-up data

See it on a project like yours

An hour with the people who build it. Bring a current job; we will walk it from subcontract to claim. Then try it yourself for 30 days, on a project of your own.